- Engineering Services
- Company
- News section
- Career
- Contact
Hidden potentials!
- City of Bocholt
- 18 ha / 2.5 million m³ of waste
- Gas capture
- Gas use
- Gas disposal
- Heating systems, operations buildings, workshops
- Lippeverband (Lippe River Management Association)
- 17.600 PE
- Heat exchanger
- 900 m PE pipe
- Heating of operations buildings and hot water processing up to 75% from wastewater heat
- City of Geldern
- Potential Study
- 85 km sewerage network
- 507 ha urban area
- Energy map
- Environmental committees