News section  >  News  >  Project news selected

NEWS

The News chronologically lists the current events as short news.

Project news

As part of the Emscher Conversion generation project, the Emschergenossenschaft redesigned also the Katernberger Bach stream, which, for the most of part, has been flowing through the Katernberg district of Essen since the 1960s. Along a stretch of 1,100 metres, the stream was given new space next to the old watercourse route and is now running open along 1.2 kilometres. The opening of the stream and the separation of clean and wastewater as well as the renaturation of obstructed drainage profiles enable an ecological improvement of the watercourse. In addition to the river engineering plans, bed slides, fords and a bridge as well as several culvert structures have been implemented. Accompanying measures along the ecologically revitalized watercourse enhance the green corridor and create a high recreational quality for the Katernberg district. The Emschergenossenschaft commissioned DAHLEM with the project planning, structural design, technical equipment and construction management for the watercourse conversion.

The illustration shows a visualisation of an accompanying measure:
Waterside playground (Hoff Landscape Architects, Essen).

It is a high-tech facility where everything is just about right. With outstanding architecture, a clearly defined purpose and state-of-the-art technology inside, its new digesters are, therefore, characteristic of Würzburg wastewater treatment plant. In the future, 4,500 tonnes of sewage sludge will be produced each year, with an almost tripled annual capacity of 10,000 cubic metres. This means more digester gas and more power generation. 4.2 million kWh of additional electricity can now be produced to be consumed directly on site. As a result of this measure, the CO2 balance improves enormously and the odour nuisance is also reduced. A focal point of the electrical engineering was the integration of the generated energy with the Mainfranken network in line with the Renewable Energy Sources Act. Specifically, the lightning protection system was a considerable planning challenge. Here, it was necessary to, on the one hand, adapt the components of the new digesters and, on the other, to protect their design membrane and the potentially explosive areas against lightning strikes. DAHLEM was responsible for the electrotechnical planning for all service phases.

At MARK 51º7, the former Opel factory site in Bochum, an industrial, technology and knowledge campus is currently being built that will fulfil the requirements of future work environments, supporting a work/life blend. With development at an advanced stage and the infrastructure almost entirely complete, the ambitious plan for the location is increasingly becoming a reality.For the development of the sewer and road construction, DAHLEM, as part of a joint venture, supervised the implementation of the gigantic and complex construction site. The design and construction supervision for the stormwater retention basin, with a volume of 6,500 m³ for protection in cases of heavy rain, has already been completed. The site was awarded the polis Award 2019 in its category as "Best urban surface recycling, MARK 51°7 - successful reactivation in eastern Bochum".

Even if there are no visible electrical installation works on the construction site of Pumping Station Oberhausen yet, the electrotechnical equipment ist making bis steps forward. At the factory acceptance test in Finland, two out of the 10 frequency converters of the "small" and "large" sewage pumps were successfully tested and approved by the manufacturer as the first components of the powerful drivelines. These are frequency converters with a nominal voltage of 690 V and a rated current of 1.180 A, respectively 1.700 A, which corresponds to a rated output of 900, respectively 1.250 kW. The high demand on the network repercussions with limit specifications to the harmonic, inter-harmonic and, for the first time, also to the supra-harmonic currents, required the frequency converters to install active line filters and correspondingly large-sized line reactors. These are, like the actual power electronics of the frequency converter, cooled by water. Each frequency converter consists of 5 control cabinets, with each frequency converter being approx. 3 m wide. Helmut Mangelmann heads the Electrical Engineering Department at DAHLEM and works in the team of the design consortium (Planungs-ARGE) of Pumping Station Oberhausen: "We have planned and built quite a lot in the field of electrical engineering, but these dimensions go far beyond the previous performance levels. In the low voltage sector, they are at the limits of what is technically possible in terms of circuit and transmission technology."

The government grant decision, which the Environment Minister Franz Unterseller (left) handed over to Lord Mayor Fritz Kuhn (middle) and City Director Wolfgang Schanz (right), Head of the Civil Engineering Department, on 3rd September on the spot, was the starting signal for the expansion of the main sewage treatment plant Stuttgart-Mühlhausen with a fourth treatment stage. The main sewage treatment plant Stuttgart-Mühlhausen, built in 1916 as one of the first sewage treatment plants in Germany, is operated by Stadtentwässerung Stuttgart (SES) and should count to the most modern ones in the Federal Republic by 2028. Due to the complexity and the considerable investment, the expansion will take place in three construction phases. In the first phase, powder activated carbon silos and dosing stations will be set up at the Biology North and South as well as an energy control centre will be built. The federal state of Baden-Württemberg supports this project with just under 3 million EUR. With the construction of the treatment stage for the elimination of trace substances, the City of Stuttgart is making a significant contribution to water protection in the federal state. Dipl.-Ing. Mathias Kleffmann, process expert at DAHLEM and project manager of the design consortium, is pleased. "It's great that we can now start with the direct dosing on a large-scale and implement the new process technology on a industrial scale." 

By means of holistic optimization, Waste Water Treatment Plant Aachen-Soers has succeeded in reducing the enormous energy demand of the recovery by around 55 per cent. Together with DAHLEM, the Wasserverband Eifel Rur planned the modernization of the oxygen supply of the aeration tanks. The design was implemented at the beginning of the year, followed by the commissioning of the blower station mid-year. The RWTH Aachen accompanies the project scientifically. DAHLEM supported the process design, which was modeled in a 3D-planning and accompanied the award procedure. The enclosed article about the project provides detailed information about the modernization of the plant. The waste water treatment plant is also referred to as a nationwide model Enterprise.
Article, "Water & Waste Water Technology” magazine, July 2019

There was much enthusiasm at an unusual design meeting on the extension of WWTP Kleve-Salmorth, which is soon to be launched as a thermo-compact plant: plant manager Michael Offenberg and his team from the Kleve-based environmental operations were able to see how it felt in the new buildings of the waste water treatment plant. Is there enough space between the plant parts? Can one move well in between? Are there any missing components, etc. With the help of VR glasses, Torsten Wach, who is in charge of the project coordination, guided the participants through the building model, which was projected directly onto a screen. It made it possible for all involved to point out errors or changes and to rectify them before the start of construction. WWTP Kleve-Salmorth is regarded as a flagship project for innovative sewage sludge treatment and meets the requirements of the new Sewage Sludge Ordinance for Waste Water Treatment Plants to reclaim phosphorus from municipal sewage sludge in the future. Thus in the long run, the supply of this nutrient, which is central to all organism, shall be ensured. DAHLEM provides the design services, from the initial conceptual design to the award, including construction supervision.

The Rhine-Main area is booming and with the increase in population, the demand for potable water is also rising. It is the second dry summer in a row. However, the amount of water needed is not the problem, its distribution is, say the experts at the Hessen Water company. The company intends to build a reduntant potable water transport pipeline west of Darmstadt. The length of the planned steel pipeline with a diameter of DN 1000 will be about 17.4 km from Riedstadt-Wolfskehlen to Gernsheim-Allmendfeld (waterworks). This also includes a connection to the Eschollbrücken waterworks and a booster station to be built there. The route is partly located in potable water protection areas, crosses a Natura 2000 site and often finds itseld in areas with high groundwater levels. For the approval of the potable water transport pipeline, Hessen Water will apply for a planning approval procedure with public participation at the Darmstadt Regional Council. DAHLEM, as part of a joint venture, provides the technical engineering services for the planning of the construction measure (design, approval and implementation planning as well as preparation and participation in the contract award procedures).

[Translate to Englisch:]

[Translate to Englisch:]

Large excavation of 95.000 tons of earth was necessary to move the former, dead straight and musty-smelling Köttelbecke into the new stream bed in the Pelkum field. Freed from dirty water, the renaturated border stream between Bottrop and Gladbeck now meanders cleanly through the reed-covered landscape. The measure is part of the Emscher Renaturation Generation Project and was celebrated on 18.09.2019 with Lord Mayor Bernd Tischler, City of Bottrop, Mayor Ulrich Roland, City of Gladbeck and the board members of the Emschergenossenschaft Prof. Dr. Uli Paetzel and Dr. Emanuel Grün. Emschergenossenschaft is investing a total of around five billion Euro in the generation project. In this way, the association is making a contribution to urban development and climate protection, said Paetzel. The enlarged water surface helps cool off heat islands and becomes a biotope for strengthening biodiversity. DAHLEM was commissioned with the construction planning for the conversion of the water body up to the involvement in the contract award.