Complete development
Road construction and drainage
Engineering services
Engineering structures, LPH 1-9
Special services
- Local construction supervision
- 2D flood simulations (GeoCPM)
Client
Bochum Perspektive GmbH
Viktoriastraße 10
44787 Bochum
Processing period
Planning: 2015 - 2020
Construction: 2016 - 2025

Contact
Dipl.-Ing. Sebastian Schelewski
Project Management
T +49 201 89 67-157
s.schelewski@dahlem-ingenieure.de
Short Description
The 68-hectare former site of the Opel Plant 1 in Bochum has been reactivated for new urban development purposes. The development of the site was carried out in several construction phases and will now be completed in 2025.
As a result of a Europe-wide VOF procedure, DAHLEM planned the development of the site in a consortium and is responsible for the drainage planning of all construction phases. In accordance with the urban development framework plan, the design planning for the drainage system was completed in 2016 in close coordination with redevelopment and open space planners. Particular attention was paid to the synergistic handling of urban flash floods and the resulting development of measures.
The 68-hectare former site of the Opel Plant 1 in Bochum has been reactivated for new urban development purposes. The development of the site was carried out in several construction phases and will now be completed in 2025.
As a result of a Europe-wide VOF procedure, DAHLEM planned the development of the site in a consortium and is responsible for the drainage planning of all construction phases. In accordance with the urban development framework plan, the design planning for the drainage system was completed in 2016 in close coordination with redevelopment and open space planners. Particular attention was paid to the synergistic handling of urban flash floods and the resulting development of measures.
Project data
- Total development area 68 ha
- Total sewer length approx. 7 km as a modified combined sewer system (DN 300 to DN 1200)
- Development in several construction phases with corresponding planning of temporary measures during the transition period
- 2 RRB as open earth basins (V = 6,500 m³ and V = 1,500 m³)
- Urban flash floods: hazard and risk mapping and development of measures
- 2D flood simulations (GeoCPM)
- Close coordination with remediation planners and open space planners