Lerverkusen WWTP
New construction of a waste water treatment plant
Engineering services
Buildings and interiors, LPH 1-3 (+ 4-9)
Engineering structures, LPH 1-3 (+ 4-9)
Technical equipment, LPH 1-3 (+ 4-9)
Structural engineering, LPH 1-3 (+ 4-6)
Client
Wupperverband
Untere Lichtenplatzer Straße 100
42289 Wuppertal
Contractual relationship
Consortium
Processing period
Planning: 2022 - exp. 2026
Construction: 2026 - exp. 2032

Contact
Dipl.-Ing. Alexander Voigt
Project Management
T +49 (0)201 89 67-251
a.voigt@dahlem-ingenieure.de
Short description
Municipal wastewater in the Leverkusen catchment area is currently treated mechanically at the association's own wastewater treatment plant in Leverkusen. Since the early 1970s, biological treatment has been carried out together with industrial wastewater from the Bayer AG plant in Leverkusen.
The Wupperverband is planning to build a separate nutrient-removing wastewater treatment plant with anaerobic sludge stabilization and gas utilization at the existing Leverkusen-Bürrig site. The new plant is to be built (partly) on the existing open space, with commissioning scheduled for 2032.
In addition to the minimum requirements for treatment performance in accordance with Annex 1 of the Waste Water Treatment Ordinance (AbfwV), the BIM project's objectives include improving effluent values to reduce wastewater discharge, P removal <0.5 mg/l, trace substance removal, reduction of multi-resistant germs, and resource recovery. The design is accompanied by ASM and CFD simulations.
Municipal wastewater in the Leverkusen catchment area is currently treated mechanically at the association's own wastewater treatment plant in Leverkusen. Since the early 1970s, biological treatment has been carried out together with industrial wastewater from the Bayer AG plant in Leverkusen.
The Wupperverband is planning to build a separate nutrient-removing wastewater treatment plant with anaerobic sludge stabilization and gas utilization at the existing Leverkusen-Bürrig site. The new plant is to be built (partly) on the existing open space, with commissioning scheduled for 2032.
In addition to the minimum requirements for treatment performance in accordance with Annex 1 of the Waste Water Treatment Ordinance (AbfwV), the BIM project's objectives include improving effluent values to reduce wastewater discharge, P removal <0.5 mg/l, trace substance removal, reduction of multi-resistant germs, and resource recovery. The design is accompanied by ASM and CFD simulations.
Project data
- Expansion size: 340,000 PE
- Peak inflow during rainy weather: 10,440 m³/h
- BIM project
- New construction of a wastewater treatment plant at the Leverkusen site, replacement of the existing mechanical treatment stage, new construction of a separate biological and advanced treatment stage on an open construction site
- Merger of four wastewater treatment plants in the surrounding area into a single wastewater treatment plant
- New construction of waterway: membrane bioreactor plant with mechanical treatment stage, additional fine screening to protect the membrane modules, simultaneous precipitation, PAH addition for trace substance removal, and flood pumping station
- New construction of a sludge path: sludge thickening, sludge stabilization (digestion), post-thickening, sludge dewatering and sludge silos, process water treatment plant, and gas storage and treatment
- New building construction: operations building, workshops, energy stations, emergency power systems