Regional Wastewater Disposal Project Tulkarem
Engineering services
comparable to HOAI phases 1-9
Client
Joint Service Council for Wastewater Disposal in the Tulkarem Region
Contractual relationship
Consortium
Processing period
2007-2019

Contact
Dr.-Ing. Helmfried Dietsch
Project Management
T +49 (0) 201 89 67-180
h.dietsch@dahlem-ingenieure.de
Shortdescription
The project sought to comprehensively and sustainably address the historic and growing sanitation problems in the Tulkarem area, improving and preserving the local aquatic environment and raising living conditions for residents and those downstream.
The project sought to comprehensively and sustainably address the historic and growing sanitation problems in the Tulkarem area, improving and preserving the local aquatic environment and raising living conditions for residents and those downstream.
Projectdata
The Consulting Services are subdivided into three parts:
- Part 1 Feasibility Study with phased implementation concept for the sewerage measures (networks and WWTP).
- Part 2 Detailed Design, tendering and construction supervision of the sewer network and WWTP
- Part 3 Study on industrial direct and indirect polluters
The designed sewerage measures include the following physical project components:
- WWTP for Stage 1: 160,000 PE, dry weather flow 15,000 m3/d.
- WWTP for Stage 2: 240,000 PE, dry weather flow 22,500 m3/d
- Trunk main (length: approx. 16 km; ND 250 — ND 1000) to connect the service areas to the WWTP
- Sewerage networks in the villages within the project area and construction of transport facilities to connect them to centralized installations (length: approx. 75 km; ND 250 — ND 1000)
- Pumping Stations Bala, Q = 72 m³/h, Hman 80 m and Shuweika Q = 252 m³/h, Hman 12,5 m
- Pressure Pipes (ND 200, length approx. 1.5 km)
- Introduction of adequate septic sludge collection procedures
- Installation of pre-treatment units in industrial sewage treatment plants
- Introduction of an environmentally sound effluent and sewage sludge disposal concept
The implemented sewerage measures include:
- Sewerage collection system in the villages within the project area and connection to the existing WWTPs (length: approx. 75 km; ND 250 — ND 1000)
- Installation of pre-treatment units in the existing industrial WWTPs